    Fire protection knowledge of cable laying

    PubDate:2020-03-23Author:Sources:Views:3293


    CableLaying fire prevention knowledge

    1. Choose flame-retardant wires and cables

    Fireproof mechanism of flame-retardant wires and cables:Under the heat of the combustion reaction, the flame retardant in the condensed phase thermally decomposes and absorbs heat, which slows down the temperature rise in the condensed phase and delays the thermal decomposition rate of the material. At the same time, it releases a chain reaction free radical blocker to make The branch interruption of flame and chain reaction slows down the gas phase reaction speed, prevents the temperature rise in the condensed phase, and achieves the fire prevention effect;

    Classification and selection of flame-retardant wires and cables:Flame-retardant cables mainly include ordinary flame-retardant wires and cables, halogen-free low-smoke flame-retardant cables, low-halogen low-smoke flame-retardant cables, and fire-resistant cables. These products have different manufacturing technologies, performance characteristics, and application ranges.





    2. Scientific design and installation

    Blocking:Fire blocking is to use fire blocking materials to block the gaps where the cables pass through to prevent the cables from catching fire and prolonging combustion. The connection between the cable trench and the electrical panel, box, cabinet, partition wall, floor slab, etc. must be flame-retardant plugging. The cable fire door should be closed for a long time, and the gap between the cable fire board and the cable trench cover should be closed.Use soft plugging material to seal tightly at densely laid cables

    Separate:The fire partition wall can divide the long cable tunnel and the cable channel into small sections to narrow the fire area. Fire-resistant partitions, aluminum silicate fiber felt, fire-resistant blocking materials, fire-resistant coatings, etc. can be used. The fire partition wall is made of slag wool, and it is used in the tunnel with the fire door;

    Coating:Applying fire-resistant paint can prevent the cable from burning after fire. The fire-resistant and flame-retardant tape is easy to construct, not easy to fall off, has strong adaptability, and is cheap.In the part of the cable entering the cabinet to the terminal head, paint all cables with fire-retardant paint or wrap fire-retardant tape twice in the area of 2 to 3 meters on both sides of the fire-proof partition wall.





    3. Set up fire prevention facilities

    Set up the fire alarm system: According to the actual situation, select the appropriate alarm probe and the alarm system suitable for the characteristics of the cable layer. At present, the linear (or cable-type) temperature-sensing detector is widely used in cable trenches and pipeline wells. ;

    High-pressure water spray fire extinguishing: High-pressure water spray fire extinguishing methods should be adopted in cable corridors and densely cabled areas. In order to make water spray fire extinguishing work in a timely and effective manner, a high-sensitivity monitoring and control system is required;

    Strengthen the ventilation of the cable layer (well): Using natural ventilation conditions, set up vents on the cable layer as close to the outer wall as possible. At the same time, a mechanical smoke exhaust system with uninterrupted power supply should be established to pass automatic The alarm linkage turns on the exhaust fan.





    4. standardize daily management



    Maintain a good operating condition: to prevent defects, aging, moisture, damage, etc. due to the internal insulation of the cableThe cable's own fault causes the cable to be short-circuited, and the arc is fired. The cable with poor insulation is found in time, and it is taken out of operation;


    Maintain a good operating environment: It is strictly forbidden for waste gas and waste water from the thermal system to flow into the cable trench and cable tunnel;



    Strengthen the monitoring and management of cable heads: Cable heads are the weak link of the cable insulation due to many factors, and the power cable terminal heads and middle parts placed in the cable trenches, cable tunnels, cable trough boxes, and cable interlayers The joints must be registered and supervised to prevent the cable hair from catching fire during operation.




    Note: This article is reprinted as a network resource. If you have any copyright infringement, please contact the administrator to delete it!


    分享到:
    主站蜘蛛池模板: 亚洲国产综合精品一区| 亚洲一区二区黄色| 国产欧美精品专区一区二区| AV熟女乱| 亚洲天堂视频在线观看| 亚洲综合色在线| 久久永久免费人妻精品| 国产大片黄在线观看| 无码专区在线观看| 三上悠亚一区二区| 伊人五月丁香综合AⅤ| 一本久道久久综合多人| 亚洲美女一级毛片| 国产制服丝袜91在线| 青青草国产精品久久久久| 国产成人亚洲综合A∨在线播放| 伊人久久大线影院首页| 91精品福利自产拍在线观看| 国产综合精品一区二区| 欧美精品v| www.99精品视频在线播放| 国产亚洲视频中文字幕视频| 国产精品亚洲va在线观看| 欧美成人免费一区在线播放| 国产日韩精品欧美一区灰| a级毛片一区二区免费视频| 精品精品国产高清A毛片| 亚洲欧美人成人让影院| 一级成人a做片免费| 日本一区中文字幕最新在线| 日韩国产高清无码| 99在线视频免费| 在线播放真实国产乱子伦| 久久综合一个色综合网| 亚洲国产精品国自产拍A| 免费在线看黄网址| 欧美中文字幕在线视频| 久久a毛片| 成人在线不卡视频| 天天色综合4| 国产伦片中文免费观看| 97国内精品久久久久不卡| 91久久天天躁狠狠躁夜夜| 伊在人亚洲香蕉精品播放| 亚洲AV无码精品无码久久蜜桃| 又黄又爽视频好爽视频| 婷婷六月激情综合一区| 国产情精品嫩草影院88av| 国产精品网址在线观看你懂的| 亚洲国产精品无码AV| 國產尤物AV尤物在線觀看| 日本不卡在线播放| 中文字幕一区二区人妻电影| igao国产精品| 亚洲无限乱码| 欧美精品aⅴ在线视频| 国产成人啪视频一区二区三区 | 亚洲黄网在线| 伊人久久影视| 亚洲AV成人一区二区三区AV| 九色91在线视频| 熟妇丰满人妻| 久久女人网| 激情综合网激情综合| 久久综合结合久久狠狠狠97色| 农村乱人伦一区二区| 久久精品国产国语对白| 先锋资源久久| 国产特一级毛片| 人妻丰满熟妇αv无码| 黄色三级网站免费| 在线观看网站国产| 亚洲婷婷在线视频| 亚洲床戏一区| 国产精品久久久久无码网站| 91麻豆国产视频| 成人欧美日韩| 97se亚洲综合不卡| 久久人人97超碰人人澡爱香蕉| 亚洲综合专区| 免费jjzz在在线播放国产| 亚瑟天堂久久一区二区影院|